    In October 2024 we were approached to design and build multiple walk-in stability chambers of specific temperature and humidity control and 20,000 Litres capacity each, to be compete and running by January 2025. Target Specifications:

    25°C ±2°C and 60%RH ±5%RH

    30°C ±2°C and 65%RH ±5%RH

    40°C ±2°C and 75%RH ±5%RH

    Problems to overcome

    • Project timeline of 12 weeks from brief to completion.
    • Must maintain temperature and humidity within the required range, at all points within the 20,000L room.
    • Each room requires a heating system, cooling system, and humidification/dehumidification system. With pedestrian access door and internal lighting for a general working environment.
    • Manufacture the rooms on site to avoid the need for transporting large items.

    The result

    The uniformity was independently NATA tested and proved well within the required specifications.